Thursday, September 18, 2008

Home Construction Update


The framing of the house is now well under way. They have now completed framing the entire first floor and will begin on the second floor soon. It is great to see it taking shape and to actually be able to walk into the rooms we have until now only seen on paper. I was very concerned about the 11 inches of rain we received over the weekend (The most ever in South Bend), but the drainage tiles they installed around the basement swept all of the water away great and by Monday it wasn't even damp in the basement dispite not having a roof over the house.
We still have to finalize the exterior colors and then we move onto the interterior cabinet design.