Showing posts with label New Home. Show all posts
Showing posts with label New Home. Show all posts

Friday, September 26, 2008

New Home Update


The framing is moving along very quickly, both the first and second floors are almost complete. Here is a picture of the front as well as a picture from the inside looking from the family room to the stairway. Grace was acting up so I sent her to her room and the third picture is her crying in her new room.
We have been very busy making selections for the house. For a color scheme we have chosen a dark greenish siding with a cream colored trim.

For the front door, we selected this craftsman style wood door.


Inside we are going with white trim and this three paneled door.
To keep with the early 20th century craftsman style of the house, we are hoping to incorporate as many vintage features as possible. Here is a sample of the interior door handle we are considering.


Next up we will be working on the kitchen cabinets and hardwood flooring.
Here is a nice video that depicts the type of cabinets and features we are looking for.

Thursday, September 18, 2008

Home Construction Update


The framing of the house is now well under way. They have now completed framing the entire first floor and will begin on the second floor soon. It is great to see it taking shape and to actually be able to walk into the rooms we have until now only seen on paper. I was very concerned about the 11 inches of rain we received over the weekend (The most ever in South Bend), but the drainage tiles they installed around the basement swept all of the water away great and by Monday it wasn't even damp in the basement dispite not having a roof over the house.
We still have to finalize the exterior colors and then we move onto the interterior cabinet design.

Thursday, September 4, 2008

Home Construction Update

The plans for our home were finalized in late July and we officially broke ground in August. They started by clearing the trees and staking out the house. They then dug the basement (shown left) and have since poured the basement walls. Framing is scheduled to begin next week and we are in the process of picking out exterior finishes such as paint, windows, door, shingles, and brick/rock. It has been very time consuming, but we are really enjoying the process so far. Here are the final floor plans and more pictures of the progress.




Tuesday, April 8, 2008

The Preliminary Plans are in!


Our home building project just took a huge step towards becoming a reality! We just recieved the hand drawn preliminary plans from the architect, Len Mysliwiec. In addition to the elevation, Len has drawn two versions of the first and second floors, click here to check out the floor plans. We welcome any and all comments, please let us know which version of each floor you like best.